• The footers and base for the new concession stand has been roughed in where the new athletic fields will be
• The headwall has been placed for the detention pond beneath the new athletic fields
• Clever Lane was closed on October 24th to allow for the new water tap that will feed the new facility. The water and electric lines are being run next to the school and back to the construction site.
• The metering vault for the water line has delivered and placed in the upper high school/senior parking lot.
• The sanitary manhole has been installed near 546 to tie into the main sanitary line.